Switch Inc.'s 'The Citadel' campus in the Tahoe Reno Industrial Center, Nevada, is planned to reach approximately 7.2 million square feet of floor area across its full build-out, making it one of the largest single data center campuses in the world by floor area (as distinct from IT power capacity, a separate metric on which other facilities may rank differently). Very large campus figures like this typically represent a multi-phase planned build-out rather than fully constructed capacity at any single point in time.
The question, scope, and sources behind this Registry record.
Switch Inc.'s 'The Citadel' campus in the Tahoe Reno Industrial Center, Nevada, is planned to reach approximately 7.2 million square feet of floor area across its full build-out, making it one of the largest single data center campuses in the world by floor area (as distinct from IT power capacity, a separate metric on which other facilities may rank differently). Very large campus figures like this typically represent a multi-phase planned build-out rather than fully constructed capacity at any single point in time.
The total planned floor area of Switch Inc.'s 'The Citadel' data center campus near Reno, Nevada, among the largest single data center developments by floor area in the world.
Change a parameter to stress-test whether a proposed result is still inside the published specification. This is an audit aid, not a proof checker.
This record has no editable parameters. Read the formal question and assumptions before challenging it.
Current frontiers derived from accepted Claims.
An observed or demonstrated result; no opposing bound is implied.
The frontier is not sacred
Most progress starts with a disagreement that survives contact with evidence. If you can push the known lower bound up or pull the upper bound down, show us the work.
≥ when you have shown that at least this value is achievable.≤ when you have shown that anything above this value is impossible.No vibes. State the value, define the scope, and link the paper, proof, code, or reproduction that lets another person check it. Editors review every challenge before the public record changes.
Challenge this recordAssertions tied to evidence, attribution, and review.
The frontier as it changed over time.
Only accepted Claims matching the current specification contribute to the displayed bounds. Strict inequalities remain open; contradictory Claims require editorial review.
1 accepted Claim, with 1 linked evidence records.
Permanent ID limitsregistry.com/limits/LR-LARGEST-DATA-CENTER-FLOOR-AREA
No active verified bounties are linked to this Limit.
View verified bounty tracker ↗No accepted machine-checked reproductions are recorded for this Limit.
Limits Registry. LR-LARGEST-DATA-CENTER-FLOOR-AREA. Largest single data center campus by floor area. 2026.