The Strömsund Bridge in Sweden, completed in 1955 and designed by German engineer Franz Dischinger, is generally credited as the first modern cable-stayed bridge — a structural type that has since become common worldwide for medium-to-long-span bridges, offering a lighter, often more economical alternative to suspension bridges.
The question, scope, and sources behind this Registry record.
The Strömsund Bridge in Sweden, completed in 1955 and designed by German engineer Franz Dischinger, is generally credited as the first modern cable-stayed bridge — a structural type that has since become common worldwide for medium-to-long-span bridges, offering a lighter, often more economical alternative to suspension bridges.
The year the first cable-stayed bridge of the modern engineering type (using steel cables running directly from deck to tower) was completed.
Change a parameter to stress-test whether a proposed result is still inside the published specification. This is an audit aid, not a proof checker.
This record has no editable parameters. Read the formal question and assumptions before challenging it.
Current frontiers derived from accepted Claims.
An observed or demonstrated result; no opposing bound is implied.
The frontier is not sacred
Most progress starts with a disagreement that survives contact with evidence. If you can push the known lower bound up or pull the upper bound down, show us the work.
≥ when you have shown that at least this value is achievable.≤ when you have shown that anything above this value is impossible.No vibes. State the value, define the scope, and link the paper, proof, code, or reproduction that lets another person check it. Editors review every challenge before the public record changes.
Challenge this recordAssertions tied to evidence, attribution, and review.
The frontier as it changed over time.
Only accepted Claims matching the current specification contribute to the displayed bounds. Strict inequalities remain open; contradictory Claims require editorial review.
Permanent ID limitsregistry.com/limits/LR-FIRST-MODERN-CABLE-STAYED-BRIDGE
No active verified bounties are linked to this Limit.
View verified bounty tracker ↗No accepted machine-checked reproductions are recorded for this Limit.
Limits Registry. LR-FIRST-MODERN-CABLE-STAYED-BRIDGE. First modern cable-stayed bridge. 2026.