The Geysers has been in commercial operation since 1960, making it also one of the longest continuously operating geothermal developments anywhere. Actual net output (around 900 MW as of recent years) runs below nameplate capacity because of natural, gradual steam-pressure decline in the underlying reservoir, which operators partially offset by injecting treated wastewater into the field to help sustain steam production.
The question, scope, and sources behind this Registry record.
The Geysers has been in commercial operation since 1960, making it also one of the longest continuously operating geothermal developments anywhere. Actual net output (around 900 MW as of recent years) runs below nameplate capacity because of natural, gradual steam-pressure decline in the underlying reservoir, which operators partially offset by injecting treated wastewater into the field to help sustain steam production.
The Geysers geothermal field in the Mayacamas Mountains of Northern California hosts 18 currently operating geothermal power plants with a combined nameplate capacity of approximately 1,517 MW, the largest concentration of geothermal generating capacity in the world, per Guinness World Records.
Change a parameter to stress-test whether a proposed result is still inside the published specification. This is an audit aid, not a proof checker.
This record has no editable parameters. Read the formal question and assumptions before challenging it.
Current frontiers derived from accepted Claims.
An observed or demonstrated result; no opposing bound is implied.
The frontier is not sacred
Most progress starts with a disagreement that survives contact with evidence. If you can push the known lower bound up or pull the upper bound down, show us the work.
≥ when you have shown that at least this value is achievable.≤ when you have shown that anything above this value is impossible.No vibes. State the value, define the scope, and link the paper, proof, code, or reproduction that lets another person check it. Editors review every challenge before the public record changes.
Challenge this recordAssertions tied to evidence, attribution, and review.
The frontier as it changed over time.
Only accepted Claims matching the current specification contribute to the displayed bounds. Strict inequalities remain open; contradictory Claims require editorial review.
1 accepted Claim, with 1 linked evidence records.
Permanent ID limitsregistry.com/limits/LR-THE-GEYSERS-GEOTHERMAL
No active verified bounties are linked to this Limit.
View verified bounty tracker ↗No accepted machine-checked reproductions are recorded for this Limit.
Limits Registry. LR-THE-GEYSERS-GEOTHERMAL. The Geysers — largest geothermal power complex in the world. 2026.