Commissioned in response to a series of South Australian blackouts and grid-stability issues in 2016-2017, Hornsdale demonstrated that lithium-ion batteries could respond to frequency disturbances roughly 100 times faster than conventional gas 'peaker' plants, prompting Australia's electricity market operator to create new, faster-responding ancillary service categories. Its early commercial success helped catalyze a wave of grid-scale battery investment worldwide; the facility has since been expanded well beyond its original 100 MW capacity.
The question, scope, and sources behind this Registry record.
Commissioned in response to a series of South Australian blackouts and grid-stability issues in 2016-2017, Hornsdale demonstrated that lithium-ion batteries could respond to frequency disturbances roughly 100 times faster than conventional gas 'peaker' plants, prompting Australia's electricity market operator to create new, faster-responding ancillary service categories. Its early commercial success helped catalyze a wave of grid-scale battery investment worldwide; the facility has since been expanded well beyond its original 100 MW capacity.
The Hornsdale Power Reserve in South Australia, a 100 MW / 129 MWh lithium-ion battery installation built by Tesla and commissioned in December 2017, was among the first grid-scale batteries to demonstrate sub-second (sub-200-millisecond) automated response to grid frequency deviations at commercial scale, and was built within 100 days per a public commitment made by Elon Musk.
Change a parameter to stress-test whether a proposed result is still inside the published specification. This is an audit aid, not a proof checker.
This record has no editable parameters. Read the formal question and assumptions before challenging it.
Current frontiers derived from accepted Claims.
An observed or demonstrated result; no opposing bound is implied.
The frontier is not sacred
Most progress starts with a disagreement that survives contact with evidence. If you can push the known lower bound up or pull the upper bound down, show us the work.
≥ when you have shown that at least this value is achievable.≤ when you have shown that anything above this value is impossible.No vibes. State the value, define the scope, and link the paper, proof, code, or reproduction that lets another person check it. Editors review every challenge before the public record changes.
Challenge this recordAssertions tied to evidence, attribution, and review.
The frontier as it changed over time.
Only accepted Claims matching the current specification contribute to the displayed bounds. Strict inequalities remain open; contradictory Claims require editorial review.
1 accepted Claim, with 1 linked evidence records.
Permanent ID limitsregistry.com/limits/LR-HORNSDALE-POWER-RESERVE
No active verified bounties are linked to this Limit.
View verified bounty tracker ↗No accepted machine-checked reproductions are recorded for this Limit.
Limits Registry. LR-HORNSDALE-POWER-RESERVE. Hornsdale Power Reserve demonstrates grid-scale battery frequency response. 2026.