Completed in its original form in 1942 and substantially expanded with a third powerhouse in 1974, Grand Coulee was central to the mid-20th-century industrialization of the U.S. Pacific Northwest, providing power for wartime aluminum production and, later, large-scale irrigation of the Columbia Basin. It remains operated by the U.S. Bureau of Reclamation and is one of the largest hydroelectric facilities outside China and South America.
The question, scope, and sources behind this Registry record.
Completed in its original form in 1942 and substantially expanded with a third powerhouse in 1974, Grand Coulee was central to the mid-20th-century industrialization of the U.S. Pacific Northwest, providing power for wartime aluminum production and, later, large-scale irrigation of the Columbia Basin. It remains operated by the U.S. Bureau of Reclamation and is one of the largest hydroelectric facilities outside China and South America.
The Grand Coulee Dam on the Columbia River in Washington State, USA, has a total installed generating capacity of 6,809 MW, making it the largest power station of any kind in North America and the largest concrete structure built in the United States.
Change a parameter to stress-test whether a proposed result is still inside the published specification. This is an audit aid, not a proof checker.
This record has no editable parameters. Read the formal question and assumptions before challenging it.
Current frontiers derived from accepted Claims.
An observed or demonstrated result; no opposing bound is implied.
The frontier is not sacred
Most progress starts with a disagreement that survives contact with evidence. If you can push the known lower bound up or pull the upper bound down, show us the work.
≥ when you have shown that at least this value is achievable.≤ when you have shown that anything above this value is impossible.No vibes. State the value, define the scope, and link the paper, proof, code, or reproduction that lets another person check it. Editors review every challenge before the public record changes.
Challenge this recordAssertions tied to evidence, attribution, and review.
The frontier as it changed over time.
Only accepted Claims matching the current specification contribute to the displayed bounds. Strict inequalities remain open; contradictory Claims require editorial review.
Permanent ID limitsregistry.com/limits/LR-GRAND-COULEE-DAM
No active verified bounties are linked to this Limit.
View verified bounty tracker ↗No accepted machine-checked reproductions are recorded for this Limit.
Limits Registry. LR-GRAND-COULEE-DAM. Grand Coulee Dam — largest power station in North America. 2026.